Transparent pricing
Material and Delivery,
Always Priced Separately.
Instant, honest, no-hassle pricing. Give us the address and the tons — we hand back the exact delivered number in 30 seconds. Accurate 98% of the time.
Why you won’t see a price list on this page
We don’t do averages. We do your number.
Every load we deliver is priced by the mile from the closest quarry to your job site. A “starting at” rate would be wrong the minute you read it — too low for the long hauls, too high for the short ones, and anchored to a number that isn’t yours.
So we skip the averages and give you the real number on the spot. Drop in an address and the tons, and our estimator returns the delivered total in about 30 seconds — material, tax, and haul broken out on the same card. No call required, no “we’ll get back to you,” no surprise at the scale.
How your estimate is built
Two lines. Always.
Most suppliers bundle haul cost into the material price and give you one number. You can’t tell what the rock costs and what the truck costs — which means you can’t build a clean bid. We split those two lines on every estimate, every time.
Actual per-ton rates and haul cost are confirmed when you submit your estimate request.
What goes into your price
Material — per ton
Priced by the ton and varies by product. You see the current per-ton rate on your estimate. Because we haul direct from the quarry, our pricing reflects what's actually on the pile — not a middleman's markup.
Delivery — by the mile
Delivery is calculated by the actual haul distance from our source to your job site. Closer means cheaper. Further means higher. There are no flat fees or hidden fuel surcharges — just the mile rate, confirmed by dispatch.
Sales tax — material only
Sales tax applies to material only — not to the delivery charge. Rate varies by job-site zip code; dispatch confirms the exact rate when they call. Delivery is always untaxed.
Load sizes
Full load or partial — we handle the rest.
Partial Load
Available for any order under a full load. Starting at 1 ton — priced per ton, confirmed the same way. We select the right equipment for your load size.
Starting at 1 ton
Not sure how many tons you need? Use the field calculator →
Fees to know about
Failed Delivery
$250 / runIf equipment arrives and can’t complete the delivery due to job-site access issues — locked gate, unstable ground, no clearance — a $250 fee applies per run, plus new material and delivery to re-attempt. See how it works.
Saturday Deliveries
+$29Saturday deliveries are available morning (6–10 AM) or flexible (any time 6 AM–6 PM) only — we hold the afternoon open for the driver. A $40 weekend surcharge is added to your estimate along with applicable tax. Sunday deliveries require special approval and may carry additional fees — contact dispatch to discuss.
Long-Haul Jobs
75+ milesDeliveries beyond 75 miles from our source require management approval before scheduling. Submit your request normally — dispatch routes it for sign-off. Usually resolved same day.
Small Load Fee
For smaller orders, a delivery surcharge may apply — calculated based on order size and distance to your source quarry. If it applies, it appears as an itemized line on your estimate before you confirm anything.
Long Haul Fee
For deliveries that require a longer haul from the source quarry, a long haul fee may apply. The fee depends on which quarry fulfills your order and the distance to your address — calculated at estimate time and always shown upfront, never added at checkout.
What you see is almost always what you pay.
Our estimates are built on real haul distances and current material pricing — not ballpark figures. The rare variance is a quarry price adjustment on the day of delivery. There are never surprises at the gate.
Earn your tier. Keep it by delivering volume.
Same model the airlines use — but for aggregate. Tell us what you’re moving and we’ll set you up with a 60-day tier challenge at the pricing that matches your target volume. Hit the number, you keep the tier. Fall short, we reset — no penalty, no contract.
Silver
50 tons per month
Entry tier. Easy to hit for a single crew running regular base course work.
Gold
150 tons per month
Multi-crew or active GC pipeline. The sweet spot for most established Valley contractors.
Platinum
300 tons per month
High-volume earthwork or paving ops. Pricing reflects the lane commitment.
Drop your info below — dispatch confirms your starting tier, walks you through the 60-day target, and flags tier pricing on every order automatically. No contract, no auto-renew.
Homeowner or one-off delivery?
Get the 1-page delivery-prep checklist.
Access, clearance, and dump-site basics — so the truck doesn’t leave with a $250 failed-delivery fee. Emailed in about 2 minutes.